| Animesh |
—
|
—
|
—
|
—
|
—
|
—
|
—
|
| Aniruddha Malpani |
• No activity captured for this day.- No activity captured for this day.
|
• Observed and raised concerns regarding zero engagement with the video chatbot and illogical chatbot behavior (Kenya patient with +91 numbe- Observed and raised concerns regarding zero engagement with the video chatbot and illogical chatbot behavior (Kenya patient with +91 number).
- Monitored website content, questioning the absence of new posts on www.drmalpani.com and requesting new articles for other websites.
- Shared a link to an article on www.drmalpani.com.
|
• No activity captured for this day.- No activity captured for this day.
|
• Provided detailed feedback on website content, design, and AI usage, pointing out inconsistencies, poor quality, and "lazy" AI application- Provided detailed feedback on website content, design, and AI usage, pointing out inconsistencies, poor quality, and "lazy" AI application across multiple tools and the "About Us" page.
- Raised urgent concerns regarding the active status of the AI video twin, instructing its immediate deactivation due to risk and suggesting a temporary placeholder and sign-up for future use.
- Followed up on unresolved issues, including the WhatsApp messaging system and www.hcgai.com login, and expressed concern about a lack of communication regarding these.
- Suggested incorporating callmissed.com into ClinicPS and emphasized the need for A/B split testing to optimize article content length.
- Directed the team to utilize AI agents for drafting patient replies, with a clear process for his review and confirmation before sending.
|
• Provided feedback on a 'Class C' document, requesting modifications regarding licensing, EO sterilization, stability, and use of the IITB - Provided feedback on a 'Class C' document, requesting modifications regarding licensing, EO sterilization, stability, and use of the IITB name.
- Issued instructions for daily article sharing (5 new articles across all websites by 7:30 AM via single email and WhatsApp message) and requested specific content edits for articles (e.g., removing a paragraph, changing "IIT Bombay" to "BETIC of IIT Bombay").
- Requested several website updates, including adding social media sharing buttons, removing the comments option, and uploading a specific document to drmalpani.com.
- Highlighted a lack of daily updates from the analyst.
|
—
|
—
|
| Anjali |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• Provided access to a resource/tool.
• Confirmed a resource was already in sharing mode.
• Queried for clarification on students creating c- Provided access to a resource/tool.
- Confirmed a resource was already in sharing mode.
- Queried for clarification on students creating content using ChatGPT.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Devanshu Singhai |
• Completed significant work for Stephens, merging diagnostic tests and audiology assessments into a single flow and streamlining child appo- Completed significant work for Stephens, merging diagnostic tests and audiology assessments into a single flow and streamlining child appointment scheduling.
- For Ekam, fixed password reset/new-user onboarding emails, resolved production seed script issues, wired and verified real email (Google Workspace), and refined notification emails with action-specific buttons.
- Identified that email functionality is proven end-to-end but not yet run on the server; similarly, file upload logic works locally but failed against a real S3 bucket due to missing CORS rules for the production origin.
- Faced issues with login and requested clarity on setting up dev credentials and access to
pem files.
|
• Completed testing on Ekam's production environment.
• Requested database cleanup, providing specific case IDs (cmsehzryj0001pd5reh71znpr a- Completed testing on Ekam's production environment.
- Requested database cleanup, providing specific case IDs (
cmsehzryj0001pd5reh71znpr and cmscn8sgl0003qz2ayfcx8l3g). - Shared weekly performance reports for Dr Malpani, MedAppraisals, and BeyondExams (Jul 28 - Aug 3).
|
• Created a new column to auto-calculate average user engagement time on a page (total time / total users).
• Currently working on Ekam.
• R- Created a new column to auto-calculate average user engagement time on a page (total time / total users).
- Currently working on Ekam.
- Requested AWS documentation from Niraj and awaiting them.
|
• Pushed code for Stephens' project, including fixes for CampDetailPage.tsx (back button logic) and CampCalendarView.tsx (day list for camps- Pushed code for Stephens' project, including fixes for CampDetailPage.tsx (back button logic) and CampCalendarView.tsx (day list for camps).
- Committed and pushed migration scripts (pnpm migrate, pnpm import:partner-sheet) and the source spreadsheet to A.1-PB for partner sheet data import.
- Requested AWS documentation and planned to upload them today, verifying the provided link works.
- Planned to fix the login page for Stephens' project by the evening.
- Hit an error while attempting to upload missing data.
|
• Pushed navigation and calendar fixes for Stephens, which have been merged to A.1-PB and are live on the test server.
• Encountered an erro- Pushed navigation and calendar fixes for Stephens, which have been merged to A.1-PB and are live on the test server.
- Encountered an error when uploading TXT files to the mindmap via a button from an email.
- Observed that files downloaded through mail lack a file extension, although ingestion from the demo org mail is working correctly.
|
—
|
—
|
| Emon |
• Created and shared documentation in task updates detailing the prompt and changes required for implementing WhatsApp hyperlinking across a- Created and shared documentation in task updates detailing the prompt and changes required for implementing WhatsApp hyperlinking across all orgs.
- Planned: Test the prompt updation for WhatsApp hyperlinking on production.
- Planned: Create a step-by-step system for purchase intent across specific products.
|
• Not feeling well, will start work from evening due to fever.- Not feeling well, will start work from evening due to fever.
|
• Created documentation for multistep product intent classification and submitted a Merge Request (MR) on the staging repo, including a test- Created documentation for multistep product intent classification and submitted a Merge Request (MR) on the staging repo, including a test sheet.
- Cherry-picked older commits for missing information in emails onto a new branch from the latest production, creating an MR that also details frontend tracking steps.
- Participated in discussions regarding adding a new endpoint, confirming that it can be integrated into the current sprint.
- The task to add a migration system for Node codebase tables/columns is pending.
|
• Planned: Test DB migrations locally and on the Dev server.
• Planned: Connect with Siddhant to discuss past research results and task upda- Planned: Test DB migrations locally and on the Dev server.
- Planned: Connect with Siddhant to discuss past research results and task updates.
- Documented thoughts on scraper configuration, automating with LLMs, and LLM call costs for tracing.
- Explored migration approaches (SQL over script) and noted "Language MR creation" and "Background flask requirement txt and toml cleanup".
|
• Completed final tests for the node codebase migration and created an MR (https://gitlab.com/devmanagementbeyondchats/beyondchats-node/-/me- Completed final tests for the node codebase migration and created an MR (https://gitlab.com/dev_management_beyondchats/beyondchats-node/-/merge_requests/540) for it.
- Made the LLM call in purchase intent traceable.
- Reported issues with the chatbot widget on Apni Pathshala, including overlapping widgets in an iframe embed and a non-functional 'continue as guest' button.
- Encountered an issue where mind map updates are not reflecting after CSV uploads and training, with vectors not loading or appearing in recently added.
|
—
|
—
|
| Gaurav |
—
|
—
|
—
|
—
|
—
|
—
|
—
|
| Gunshika Grover |
• Made 16 fresh calls to new leads.
• Completed 20 follow-ups on proposals.
• Started work late today, which impacted progress.- Made 16 fresh calls to new leads.
- Completed 20 follow-ups on proposals.
- Started work late today, which impacted progress.
|
• Completed 23 follow-ups.
• Planned: Generate 15 new leads.
• Planned: Follow up on 5 new leads from yesterday.
• Planned: Confirm status o- Completed 23 follow-ups.
- Planned: Generate 15 new leads.
- Planned: Follow up on 5 new leads from yesterday.
- Planned: Confirm status of 21 hospitals.
|
• Confirmed status for all hospitals listed in the sales tracker sheet (rows 30-53 and 102-116).
• Contacted 20 leads.
• Scheduled a demo wi- Confirmed status for all hospitals listed in the sales tracker sheet (rows 30-53 and 102-116).
- Contacted 20 leads.
- Scheduled a demo with Kailash Hospital, Dehradun for August 7th at 2 PM, and shared the meeting and Calendly links.
|
• Planned: Contact 28 new leads.
• Planned: Perform 11 follow-ups from yesterday.
• Planned: Confirm status of 13 hospitals from the sales t- Planned: Contact 28 new leads.
- Planned: Perform 11 follow-ups from yesterday.
- Planned: Confirm status of 13 hospitals from the sales tracker sheet (102-116).
|
• Planned: Call rows 18-27 and 89-100 in the final sales tracker to collect correct contacts and confirm status.
• Planned: Make a demo call- Planned: Call rows 18-27 and 89-100 in the final sales tracker to collect correct contacts and confirm status.
- Planned: Make a demo call to Kailash Hospital.
- Was engaged in a presentation and unable to join a team meeting.
|
—
|
—
|
| Gyanesh Pratap Singh |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Nazeer Manchekar |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Niraj Kumar |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Nishta Jethwani |
—
|
—
|
—
|
—
|
—
|
—
|
—
|
| Nithin R |
• Began creating staging branches/MRs for the daily bug fix report and for adding new fields to bot behavior support tickets.
• Discussed an- Began creating staging branches/MRs for the daily bug fix report and for adding new fields to bot behavior support tickets.
- Discussed and confirmed implementation details for the daily bug fix report, including its placement in the support section of the dashboard for "god users" and its display as a dialog box.
- Planned: Implement shadow DOM for embed.
- Planned: Address regex related rubrics not showing up for a regression case if LLM scorer is selected.
|
• Shadow DOM implementation for the embed is done.
• Currently testing the Shadow DOM implementation, including creating a sample Netlify to- Shadow DOM implementation for the embed is done.
- Currently testing the Shadow DOM implementation, including creating a sample Netlify to test new onboarding clients and existing organizations.
- Planned: Investigate and fix the broken "connected" status on integration pages.
|
• Notified the team about a doctor's appointment at 3 PM, missing the daily connect.- Notified the team about a doctor's appointment at 3 PM, missing the daily connect.
|
• On sick leave today.
|
• Created Laravel Staging MR for the "connected" status issue on integration pages.
• Blocked on creating Dashboard Staging MRs for the inte- Created Laravel Staging MR for the "connected" status issue on integration pages.
- Blocked on creating Dashboard Staging MRs for the integration pages task, as
refactor/standardize-integration-pages changes are missing in staging. - Planned: Work on using guest users' IP addresses as email.
- Planned: Add a weekly cron to check vector DB for 404 links and share this report.
|
—
|
—
|
| PS |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Pankaj Baranwal |
• Pushed logging and deployment-related changes to the A.1-PB branch for Ekam CRM, seeded real user data, and coordinated on finalizing the - Pushed logging and deployment-related changes to the
A.1-PB branch for Ekam CRM, seeded real user data, and coordinated on finalizing the prod branch for deployment. - Provided an update on the Swami Vivekananda chatbot, confirming it is working and noting feedback on latency/quality for future action.
- Highlighted the requirement for tracing internal LLM thoughts to understand sources, data, and potential hallucinations.
- Shared an updated credentials sheet with the team.
- Engaged in discussions regarding the need to add article optimization functionality to seo-forge if it is not currently supported.
|
• Confirmed "Ekam is live" and progressed DrMalpani updates by providing UI feedback, instructing on A/B testing, making an article live, an- Confirmed "Ekam is live" and progressed DrMalpani updates by providing UI feedback, instructing on A/B testing, making an article live, and directing daily article generation via seoforge. An issue with the AI pipeline for Hindi articles was also identified and fixed.
- Followed up on AWS account status and activation of credits, delegating these tasks to Devanshu. Also provided technical direction for ClinicOS to use WBM APIs for trigger events and discussed analytics data residency.
- Manually renewed company tools due to ongoing HDFC autopay issues and raised multiple data quality and definition questions regarding an analytics document.
- Highlighted issues with the ticket system sending an excessive number of emails and observed a discrepancy with the chat bot not auto-updating country codes based on user location.
|
• Crossed off several ToDos from the Ekam sheet.
• Engaged in discussions related to AWS and Ekam.
• Planned: Sales discussion for post-demo- Crossed off several ToDos from the Ekam sheet.
- Engaged in discussions related to AWS and Ekam.
- Planned: Sales discussion for post-demo.
- Planned: Finalise AWS delegation and Siddhivinayak next steps.
- Planned: ClinicOS updates.
|
• Confirmed the HCG-AI login issue is resolved and integrated into the clinic ecosystem; also provided the full codebase for the Questionnai- Confirmed the HCG-AI login issue is resolved and integrated into the clinic ecosystem; also provided the full codebase for the Questionnaire popup.
- Provided extensive feedback on the chatbot, identifying issues such as blank screen flickering, diagnostic test display, mixed language, and uncaptured details. Also gave a detailed update on the AI Video twin, including current accessibility and suggestions for disclaimers.
- Summarized the DrMalpani website's goals for the past 4-5 months and committed to focusing on building a unified design language and aesthetics going forward.
- Assigned tasks for partner sheet data migration and specific branch merges (
donor-mgmt-live into phaseA.1-pb), and specified requirements for a new multi-file upload feature in Ekam CRM. - Noted that Whatsapp Journeys are experiencing delays, and identified HIS integration as blocked pending API access.
|
• Completed the Jahnvi hospital meeting.
• Advanced the DrMalpani UI/UX revamp by auditing clinic and competitor websites, creating an imple- Completed the Jahnvi hospital meeting.
- Advanced the DrMalpani UI/UX revamp by auditing clinic and competitor websites, creating an implementation document, and sharing Dr Malpani's design guidelines for upcoming work.
- Connected with HLC Multispeciality Surgical Hospital, gathering initial operational details and identifying their website developer for potential collaboration.
- Engaged in Amcare next steps, working on the integration document and requesting final formatting edits. Expressed being overwhelmed by "too many loose ends" currently.
|
—
|
—
|
| Pankaj Baranwal |
—
|
—
|
—
|
—
|
—
|
—
|
—
|
| PavaN |
• Raised a staging MR for newly added chat filters.
• Implemented the tier override dialog with radio cards (Core/Major/Minor) for endpoints- Raised a staging MR for newly added chat filters.
- Implemented the tier override dialog with radio cards (Core/Major/Minor) for endpoints, allowing tier changes from the health page.
- Fixed the minor tier filter showing zero results by addressing the null tier fallback.
- Enhanced route display to show with leading slashes and moved unmatched requests to a separate info section.
|
• Added a new section for non-API endpoints, including empty and unmatched routes.
• Started working on the Laravel backend unit test plan f- Added a new section for non-API endpoints, including empty and unmatched routes.
- Started working on the Laravel backend unit test plan for Phase 0, opting for PHPUnit over Pest.
- Faced power cuts due to heavy rain and was unable to attend the daily connect.
|
• Advanced Phase 0 finalization by implementing a new section for non-API endpoints.
• Started and continued working on unit test implementa- Advanced Phase 0 finalization by implementing a new section for non-API endpoints.
- Started and continued working on unit test implementation for the Laravel backend (Phase 0), opting for PHPUnit.
- Shared a documentation link for the unit test plan and submitted two Merge Requests (1697 and 1731) for review.
- Updated the task sheet and is currently awaiting feedback on the shared MRs and documentation for next steps.
|
• Planned: Work on adding Playwright-based UI/UX testing for the beyondchats-embed project.
• Confirmed readiness to start the UI/UX testing- Planned: Work on adding Playwright-based UI/UX testing for the beyondchats-embed project.
- Confirmed readiness to start the UI/UX testing task and inquired about any prerequisite work.
- Requested a team member to add necessary variables to the beyondchats-embed repository's CI/CD, potentially a dependency for the planned testing.
|
• Continued Playwright UI/UX testing for beyondchats-embed.
• Encountered an issue with the E2ETESTORGID variable during a dry run, requirin- Continued Playwright UI/UX testing for beyondchats-embed.
- Encountered an issue with the E2E_TEST_ORG_ID variable during a dry run, requiring it to be set to "beyondchats".
|
—
|
—
|
| Poonam Baranwal |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• Reached out to an analyst to request last week's updates.
• Specifically requested 1 week updates for pod A from an analyst.- Reached out to an analyst to request last week's updates.
- Specifically requested 1 week updates for pod A from an analyst.
|
—
|
—
|
| Ramanand Tomar |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Ritika Sankhla |
• Conducted 20 follow-ups and made 20 fresh calls.
• Scheduled a demo with ApolloJBP for tomorrow.
• Awaiting contact details (marketing man- Conducted 20 follow-ups and made 20 fresh calls.
- Scheduled a demo with ApolloJBP for tomorrow.
- Awaiting contact details (marketing manager's email) to provide an update.
|
• Shared an update that someone has joined a meeting/call. • Communicated that the demo has been rescheduled to August 8th at 6 PM.- Shared an update that someone has joined a meeting/call. • Communicated that the demo has been rescheduled to August 8th at 6 PM.
|
• Planned: Work on 15 leads from Gunshika.
• Planned: Process 15 fresh leads.
• Planned: Connect to the sales sheet.- Planned: Work on 15 leads from Gunshika.
- Planned: Process 15 fresh leads.
- Planned: Connect to the sales sheet.
|
• Conducted a demo for Santati Fertility, discussing the use of Exotel voice agents.
• Confirmed an offline demo with Dr. Jaisingh for Jhanv- Conducted a demo for Santati Fertility, discussing the use of Exotel voice agents.
- Confirmed an offline demo with Dr. Jaisingh for Jhanvi Multispeciality Hospital & Research Center scheduled for tomorrow, August 7th, at 10:00 AM.
- Identified a new lead for HLC Multispeciality Surgical Hospital and noted the demo details.
- Joined a meeting at 5:30 PM.
|
• Coordinated a physical demo for Roy's Hospital with Dr. Mala (Director) for Monday, August 10, 2026 (12:00 PM - 1:00 PM).
• Coordinated a - Coordinated a physical demo for Roy's Hospital with Dr. Mala (Director) for Monday, August 10, 2026 (12:00 PM - 1:00 PM).
- Coordinated a physical demo for KCCCare Krishna Care Hospital with Dr. Rohit (Director) for Friday, August 7, 2026 (5:00 PM - 8:30 PM), noting the hospital is currently running advertisements.
|
—
|
—
|
| Roshan Singh |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Sachin K. |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Sahil Parashar |
—
|
—
|
—
|
—
|
—
|
—
|
—
|
| Santosh Asthana |
—
|
—
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Sarthak |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Saurabh |
• Completed linking of TBMC full and drmlapni websites (with remaining steps).
• Performed a full security audit of the exposed backend APIs- Completed linking of TBMC full and drmlapni websites (with remaining steps).
- Performed a full security audit of the exposed backend APIs for TMBC.
- Fixed an issue related to a refactored Claude schema, backfilled data, and provided instructions for the
claudelens:sync-history feature to ensure updated information is sent to the server. - Working on variant A/B testing for the hero section (Drmalpani).
- Asked for clarification on "webmaster work" and details about a "priority 1" task related to the hero section.
|
• Deployed new hero section variants for drmalpani.com to production, including auto-scroll on card click and GA events for A/B split.
• Co- Deployed new hero section variants for drmalpani.com to production, including auto-scroll on card click and GA events for A/B split.
- Completed end-to-end linking of TBMC with SeoForge, enabling article generation.
- Enabled the SeoForge Optimiser for drmalpani (optimizing one article daily) and will start it for TBMC.
- Encountered a blocker: OpenAI account is out of credits.
|
• Engaged in discussions regarding the architectural design of agent flows, suggesting an approach to integrate a knowledge search engine as- Engaged in discussions regarding the architectural design of agent flows, suggesting an approach to integrate a knowledge search engine as a tool for an agent to manage both FAQ and information-gathering capabilities.
- Inquired about collecting user credentials for storage within the tool.
- Identified Heygen avatar and Elevenlabs audio as major cost contributors and proposed exploring cheaper alternatives for Elevenlabs, while also researching options for live avatars.
- Requested PM's expectations on proposed architectural changes to facilitate better planning.
|
• Finalized and tested the inquiry agent MVP end-to-end.
• Added a frontend tweak to the admin dashboard to improve patient history visibili- Finalized and tested the inquiry agent MVP end-to-end.
- Added a frontend tweak to the admin dashboard to improve patient history visibility.
- Deployed the inquiry agent for testing (link: https://ai-twin.drmalpani.com/video-consultation?agent=intake).
- Requested feedback for the next iteration of the agent.
|
• Implemented a feature for the agent to remember user progress across sessions, enabling users to resume from where they left off. This was- Implemented a feature for the agent to remember user progress across sessions, enabling users to resume from where they left off. This was built using the 'ivfindia questionnaire branching thing'.
- Is working on refining the current version and has new ideas for further development.
- Plans to share a report detailing UI/UX improvements and additional functionalities before starting implementation.
|
—
|
—
|
| Shahid Khan |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• Granted access as requested.- Granted access as requested.
|
• Followed up on the KEM bug concerning "unwanted info + symbols" syntax, inquiring about its fix.
• Enquired about the ETA for the "IVF Ind- Followed up on the KEM bug concerning "unwanted info + symbols" syntax, inquiring about its fix.
- Enquired about the ETA for the "IVF India" related tasks.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Siddhant Jain |
• Completed sprint goal setting, updated the product sheet to carry over pending tasks, and framed tasks for incident reporting.
• Successfu- Completed sprint goal setting, updated the product sheet to carry over pending tasks, and framed tasks for incident reporting.
- Successfully QA'd and made the dashboard chatbot live, adding minimization and a "raise a ticket" option to its starter page.
- Fixed a bug where the new conversation button stopped working on the chat history page.
- Resolved issues related to the "ask user for email after N messages" feature, which was causing crashes.
- Planned: Set QA ETAs for tasks and introspect on the divergence between Clinic OS and Beyondchats.
|
• Granted access to the beyondchats-node-backend GitLab repository.
• Planned to work on reducing/grouping emails, message scheduling, and s- Granted access to the
beyondchats-node-backend GitLab repository. - Planned to work on reducing/grouping emails, message scheduling, and sitemap scraping v2.
- Planned to address better handling of join live chat for Meta WhatsApp integration and ML/AI optimisations.
|
• Shipped FB comment automation and DMs for Dr. Priyanka.
• Improved CI job performance by setting up his PC as a second GitLab runner.
• Di- Shipped FB comment automation and DMs for Dr. Priyanka.
- Improved CI job performance by setting up his PC as a second GitLab runner.
- Discussed a bug regarding user message limits and sign-in page persistence.
- Initiated connection with a team member for a meeting.
|
• Started work for the day.
• Fixed an issue.
• Mentioned needing to check on something.- Started work for the day.
- Fixed an issue.
- Mentioned needing to check on something.
|
• Announced the launch and configuration details for the sitemap scraping feature, now live as a god-only feature with public release planne- Announced the launch and configuration details for the sitemap scraping feature, now live as a god-only feature with public release planned by August 17th.
- Delegated 8 bugs (5 with today's ETA, 3 for tomorrow) to Nithin for ivfindia and support pages, and actively managed other support tickets including resolving one with detailed documentation.
- Shared a Gitlab fork for WhatsApp messaging dashboard deployment, potentially addressing the meta WhatsApp blocker.
- Managed project tasks by setting ETAs for tickets and noted the need to update the mind-map.
|
—
|
—
|
| Simran Jain |
• Planned to finalize the Amcare call today.
• Offered to take a post-demo call and asked for necessary preparations.
• Joined the 7 PM call- Planned to finalize the Amcare call today.
- Offered to take a post-demo call and asked for necessary preparations.
- Joined the 7 PM call with Abhishek Ji.
- Shared a summary of the Apollo JBP Hospital demo, noting their interest in services.
|
• Completed "Take follow up" and "Call Vaibhav Sir for BG draft".
• A post-demo call was scheduled for 2 PM but was later rescheduled for to- Completed "Take follow up" and "Call Vaibhav Sir for BG draft".
- A post-demo call was scheduled for 2 PM but was later rescheduled for tomorrow at 10:30 AM.
- Planned: Amcare and Mukat call, final check and update sales sheet, and mapping features and costing.
|
• Shared the final sales sheet (link provided).
• Provided a Calendly link for booking meetings, explaining the process for receiving a meet- Shared the final sales sheet (link provided).
- Provided a Calendly link for booking meetings, explaining the process for receiving a meeting link.
- Requested coordination for scheduling a meeting with Gunshika.
|
• Conducted a demo for Santati Fertility and discussed their needs for Exotel voice agents.
• Coordinated and scheduled two more demos: a ph- Conducted a demo for Santati Fertility and discussed their needs for Exotel voice agents.
- Coordinated and scheduled two more demos: a physical demo for HLC Multispeciality for today at 7 PM and an offline demo for Jhanvi Multispeciality for tomorrow at 10 AM.
- Made progress on Amcare: completed level 1 verification of their document and discussed key requirements, confirming their interest to start ASAP.
- After initial coordination issues, successfully scheduled a call with Siddhivinayak for tomorrow, August 7th.
- Created a group with Dr. Ravi.
|
• Completed coordination for Jhanvi Hospital, including gathering meeting minutes, detailing their needs for a reports analyzer, and outlini- Completed coordination for Jhanvi Hospital, including gathering meeting minutes, detailing their needs for a reports analyzer, and outlining the next steps.
- Shared proposal documents for Asha Hospital and Amcare, and worked on a general proposal version 1.
- Provided an update to Sneha regarding pricing and committed to sharing it by tomorrow; similarly, committed to finalizing Amcare details tomorrow.
- Coordinated with HLC Multispeciality Hospital and gathered details on their patient acquisition methods.
- Blocked on Siddhivinayak Hospital coordination as the contact person, Samiksha ji, was unreachable.
|
—
|
—
|
| Vishal 23cs460 |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|
| Yash |
• Shared detailed MOM for WhatsApp Bulk Messaging Tracking, outlining existing analytics, sync requirements, and a gap analysis between Clin- Shared detailed MOM for WhatsApp Bulk Messaging Tracking, outlining existing analytics, sync requirements, and a gap analysis between Clinic OS and WhatsApp dashboard for tracking points.
- Provided an update on the BeyondChats × Clinic OS Usage Tracking Plan, detailing the current status of implementing 32 tracking points (6 possible, 15 partially supported, 11 not captured).
- Noted issues with incorrect credentials for the dev dashboard, suggesting a need to reset and reconnect.
|
• Made significant progress on the BeyondChats–Clinic OS integration, reporting 90% completion.
• Decided to maintain separate databases for- Made significant progress on the BeyondChats–Clinic OS integration, reporting 90% completion.
- Decided to maintain separate databases for usage analytics for Clinic OS and the Bulk Dashboard rather than merging them.
- Shared a code artifact for review related to the integration.
- Planned to dedicate an additional 1-2 days to simplify the UI to enhance user-friendliness and guide users through setup.
- Requires access to the
beyondchats-node-backend repository.
|
• Provided a detailed update on Usage Tracking status, noting 10 out of 32 points as "Live & Verifiable".
• Indicated 6 points related to Us- Provided a detailed update on Usage Tracking status, noting 10 out of 32 points as "Live & Verifiable".
- Indicated 6 points related to Usage Tracking are currently "In Progress".
|
• Provided a detailed status update on usage tracking: 20 of 32 metrics are live, 4 need screens, and 8 are externally blocked. Also outline- Provided a detailed status update on usage tracking: 20 of 32 metrics are live, 4 need screens, and 8 are externally blocked. Also outlined the new Analytics page in Clinic OS, replacing Adoption, with tabs for Adoption, Outcomes, and Health.
- Confirmed the ownership strategy for WhatsApp analytics: the WABA dashboard will remain the source of truth, with Clinic OS consuming data to surface required adoption/outcome metrics.
- Requested reconnection of the Meta account with WABA in the beyondchats org on the dev server to enable end-to-end testing.
|
• Finalized system architecture: Clinic OS will handle clinic operations, while the WhatsApp Bulk Dashboard will be the single WhatsApp engi- Finalized system architecture: Clinic OS will handle clinic operations, while the WhatsApp Bulk Dashboard will be the single WhatsApp engine, ensuring templates and journeys stay in sync and removing duplicate WhatsApp paths.
- Integrated Dr. Malpani with the Beyondchats dev server organization by removing the explicit binding of its production URL; conducted tests confirming data and templates were shown correctly.
- Outlined 5 requirements dependent on external tools (PostHog, Sentry, and a support/ticketing system) and shared a PDF detailing overall production rollout requirements.
- Blocked on end-to-end WhatsApp integration testing because a test number is linked to the WhatsApp Bulk Dashboard, requesting to add a real WhatsApp number for E2E testing.
- Experiencing system performance issues causing delays in running workflows, with plans to replace the system next month.
|
—
|
—
|
| khushirass1998 |
• Reached out to a superior to discuss the Pod Assessment but was unable to connect.- Reached out to a superior to discuss the Pod Assessment but was unable to connect.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• Completed SST written work for Class 6 to 7.- Completed SST written work for Class 6 to 7.
|
—
|
—
|
| 🕉 नमः शिवाय |
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
• No activity captured for this day.- No activity captured for this day.
|
—
|
—
|