Week of 2026-05-18

6 working days · 27 members

No team summary for this week yet. Run npm run job WeeklyTeamSummaryJob Friday evening to generate.
Member 05-1805-1905-2005-2105-2205-23 Week
Aniruddha Malpani
• Engaged in discussions, inquiring about a feature allowing patients to upload embryo photos for grading. • Requested a URL, likely for sha
  • Engaged in discussions, inquiring about a feature allowing patients to upload embryo photos for grading.
  • Requested a URL, likely for shared content or a specific resource.
  • Questioned the quantity of a shared article.
Anjali
Devanshu Singhai
• Confirmed "How Ground Truths Improve Chatbot Accuracy" is good to go. • Identified an issue with blurring in "Export Leads / CSV" and note
  • Confirmed "How Ground Truths Improve Chatbot Accuracy" is good to go.
  • Identified an issue with blurring in "Export Leads / CSV" and noted the need to create a v2 with new code.
  • Received a task to create a demo for "Auto-Created Tickets" using Elefant's dashboard, instead of the AI chatbot overview.
  • Shared details on clinic call timings being fixed while user online consultation booking remains flexible.
• Provided detailed feedback on the ROI mail, suggesting improvements for metrics presentation, week-on-week comparison, and a cumulative
  • Provided detailed feedback on the ROI mail, suggesting improvements for metrics presentation, week-on-week comparison, and a cumulative
• Provided detailed feedback and instructions for video recordings, focusing on blurring sensitive information (numbers, emails), correcting
  • Provided detailed feedback and instructions for video recordings, focusing on blurring sensitive information (numbers, emails), correcting random blurring, and enhancing content for the ticket screen.
  • Coordinated and followed up on two pending videos, noting that only one was received by EOD despite prior communication, and stressed the urgency for both to be finalized today.
  • Communicated issues with call coordination, including Madhyant being unreachable and the uncertainty of a 5:30 PM call with Pride IVF.
  • Reported being "unable to login," potentially impacting tasks or calls.
• Sent an access request. • Clarified meaning of "aap" regarding Beyondchats. • Waiting for confirmation from a colleague regarding sharing
  • Sent an access request.
  • Clarified meaning of "aap" regarding Beyondchats.
  • Waiting for confirmation from a colleague regarding sharing services and features.
Emon
• Confirmed the Laravel log fetch endpoint retrieves data but encountered an issue where logs couldn't be found in S3 on the dev server. • I
  • Confirmed the Laravel log fetch endpoint retrieves data but encountered an issue where logs couldn't be found in S3 on the dev server.
  • Identified that the log endpoint is not online on the dev server.
  • Planned: Check dev server for updated endpoints, test the fetch logs for Node, connect with Ram for raw email data, and prepare email data for finetuning Gemini.
  • Was blocked for most of the day due to a laptop screen repair, which limited access to work tools.
• Performed a detailed investigation into log rotation and S3 shipping for the dev node server, confirming the absence of a log shipper to S
  • Performed a detailed investigation into log rotation and S3 shipping for the dev node server, confirming the absence of a log shipper to S3 and that Node.js applications do not currently produce date-based log files.
  • Discovered that PM2 logs for Node.js are appended indefinitely without time-based rotation, and no logrotate.d entry is configured for the node server.
  • Successfully scraped approximately 1230 web pages using Claude code with Firecrawl and shared the final CSVs containing filtered, non-free resource pages.
  • Pending: Implementing logrotate for the dev node server, ensuring it matches production, and testing log fetching, based on the investigation's findings.
• Completed checks for logrotate setup on the dev server, tested node and Laravel endpoints, and updated both node fetch log and Laravel end
  • Completed checks for logrotate setup on the dev server, tested node and Laravel endpoints, and updated both node fetch log and Laravel endpoints for AWS log uploads.
  • Discussed implementing a new prompt field for "elefant" and investigated how to create chatbot test links on the dev server to generate node server logs.
  • Identified that a "repeated intent detection" feature from an older MR is missing from the production codebase, and noted "very poor responses" from the chatbot, offering to make necessary changes for the merge.
• Investigated existing chatbot pricing information, noting potential discrepancies in the mindmap. • Explored web scraping methods and tool
  • Investigated existing chatbot pricing information, noting potential discrepancies in the mindmap.
  • Explored web scraping methods and tools, specifically discussing how to scrape the "Della" website using beautifulsoup.
  • Planned and started implementing a simple web scraper for a single page using requests and beautifulsoup.
  • Communicated unavailability until 4 PM due to college work, with an intent to work afterwards.
Gunshika Grover
Gyanesh Pratap Singh
Nazeer Manchekar
• Planned: Retry BrikOven WhatsApp integration to check for Meta-side resolution and follow up with Pankaj on shared screenshots for a fix/w
  • Planned: Retry BrikOven WhatsApp integration to check for Meta-side resolution and follow up with Pankaj on shared screenshots for a fix/workaround.
  • Planned: Complete a new BeyondChats account setup from scratch to understand the full onboarding flow end-to-end, and document each stage of the setup (account creation, integrations, configuration, testing, and go-live).
  • Planned: Update the CSM sheet with yesterday’s progress.
• Participated in a "New account setup" call with Siddhant, accessed Notion guides, and practiced chatbot configuration. • Noted that new ac
  • Participated in a "New account setup" call with Siddhant, accessed Notion guides, and practiced chatbot configuration.
  • Noted that new account setup currently requires "God mode" and identified a need for a structured guide for Prompt and Unsure messages.
  • Determined that onboarding staging is a required step for new account setups.
  • Followed up with a team member regarding the BrikOven WhatsApp integration blocker.
• Confirmed Elefant's dashboard is working and Vaaneet successfully reconnected WhatsApp. • Investigated a WhatsApp Business account integra
  • Confirmed Elefant's dashboard is working and Vaaneet successfully reconnected WhatsApp.
  • Investigated a WhatsApp Business account integration issue where the number is active and linked to Xeno, but META shows it's not a business account. Identified the client had registered and logged out and is attempting to retry the integration.
  • Noted a similar WhatsApp number issue for Brikoven (active but logged off from WhatsApp Business) and is following up to check number availability.
  • Planned: To review Auraqle and Ekam dashboards to check chatbot effectiveness and client expectations, and provide a crisp update to Vaaneet for Elefant.
  • Ajay is unavailable for a week; currently having difficulty connecting with Vaaneet or Sourabh.
• Successfully removed erroneous data from the Della mind-map, resolving the bot's incorrect 4-course meal and drink responses. • Coordinate
  • Successfully removed erroneous data from the Della mind-map, resolving the bot's incorrect 4-course meal and drink responses.
  • Coordinated with Siddhant on Pankaj's reported bug/edge case and confirmed intent to cover the full 8-item chase list, including P0 Elefant issues (R68 AI cooldown, R70 Messenger/Instagram DM chat status bug).
  • Relayed Elefant's "Poor responses!" feedback to the team and initiated a call with Sourabh.
  • Inquired about a ticketing system demo connected to Exotel, Email, WhatsApp, and social media.
Niraj Kumar
• Reported that the iOS UI issue persists. • Engaged in discussions regarding the product roadmap and sprint planning, with an objective to
  • Reported that the iOS UI issue persists.
  • Engaged in discussions regarding the product roadmap and sprint planning, with an objective to build the Clinic dashboard within the next two months.
  • Proposed a call tomorrow at 11 AM to continue roadmap discussions.
• No activity captured for this day.
  • No activity captured for this day.
• Shared an opinion that a full-time designer is not needed at this stage, noting current reliance on AI tools for frontend work. • Proposed
  • Shared an opinion that a full-time designer is not needed at this stage, noting current reliance on AI tools for frontend work.
  • Proposed creating a lightweight design system to standardize designs across projects, especially for dashboard-operated products.
  • Suggested exploring hiring a part-time designer specifically for the Beyondchats Design system.
  • Requested the link for the support page from a team member.
Nithin R
• Planned: Work on formula-based filtering in dashboard and custom filters. • Planned: Create a single place for experimental features. • Cl
  • Planned: Work on formula-based filtering in dashboard and custom filters.
  • Planned: Create a single place for experimental features.
  • Clarified that consultation scheduling and booking can be done at any time.
• Made significant progress on the Google Calendar integration for chatbot-based appointment booking, including end-to-end testing, and plan
  • Made significant progress on the Google Calendar integration for chatbot-based appointment booking, including end-to-end testing, and plans to share a demo video for approval before creating an MR.
  • Implemented a proxy fallback solution (referenced Merge Request 90).
  • Added the ability to change working hours from the dashboard for clinic-side adjustments.
• Provided a demo video for Google Calendar and GMeet call scheduling integration. • This indicates completion of fixing minor bugs and end-
  • Provided a demo video for Google Calendar and GMeet call scheduling integration.
  • This indicates completion of fixing minor bugs and end-to-end testing for the calendar integration.
  • Planned to pick up the next task from the list: dashboard formula and custom filter work.
• Updated the dashboard UI for Google Calendar sync. • Investigated Google OAuth requirements for GCP projects, noting that manual clinic em
  • Updated the dashboard UI for Google Calendar sync.
  • Investigated Google OAuth requirements for GCP projects, noting that manual clinic email additions are not required for production but some form of Google verification is needed.
  • Reported a failing embed build on GitLab, identifying a "Module not found" error related to './HeyGenAvatar/useRingingSound'.
  • Planned to work on Dashboard formulas and custom filters, check user-suggested question tasks, and add information generation to GMeet notes for calendar invites.
PS
• Created a feature video. • Called 30 new prospects and sent 10 new mails. • Followed up with 32 prospects. • Offered to take an upcoming d
  • Created a feature video.
  • Called 30 new prospects and sent 10 new mails.
  • Followed up with 32 prospects.
  • Offered to take an upcoming demo call.
• Demo call with Pride IVF was rescheduled to next week as the client is out on an official trip. • Held a call where one video for the week
  • Demo call with Pride IVF was rescheduled to next week as the client is out on an official trip.
  • Held a call where one video for the week was finalized, with two more expected by EOD.
  • Encountered an issue sharing content, noting it was "unable to extrct on loom".
  • Planned to connect with 30 new leads, follow up with prospects, and send mails to prospects.
• Shared two Loom videos, likely related to client demos or preparations. • Coordinated the Prime IVF demo for today, sharing meeting detail
  • Shared two Loom videos, likely related to client demos or preparations.
  • Coordinated the Prime IVF demo for today, sharing meeting details.
  • Actively attempted to contact the client (Madhyant) for the Prime IVF demo.
  • Identified the client was unreachable and on leave, leading to the demo's cancellation and rescheduling for next week.
  • Took a day off due to urgent family matters and not feeling well, which impacted other planned work.
• Prepared and shared two documents (likely proposals or write-ups) for review, addressing client requests from Baby Joy and another client.
  • Prepared and shared two documents (likely proposals or write-ups) for review, addressing client requests from Baby Joy and another client.
  • Shared two Loom videos, one related to Jindal IVF and another explaining a specific ticket.
  • Sought guidance on the content for a comprehensive Beyondchats document requested by Rohit at Jindal IVF.
Pankaj Baranwal
• Reported that OpenAI is not linked with contactbeyondcahts. • Offered assistance to a teammate, stating "Call me for this when needed". •
  • Reported that OpenAI is not linked with contactbeyondcahts.
  • Offered assistance to a teammate, stating "Call me for this when needed".
  • A demo with Prime IVF was scheduled for today at 5:30 PM IST.
  • Was asked to enable Dynamic welcome messages for TheBestMedicalCare website.
  • Was asked about the status of the CSM group from the past two days.
• Was asked to check the sales group for the status of the Pride IVF meeting. • Was included in a request to stress test major client accoun
  • Was asked to check the sales group for the status of the Pride IVF meeting.
  • Was included in a request to stress test major client accounts: MedicalAppraisals, DrMalpani, ApniPathshala, PSchool, and Auraqle.
• Checked Della and Elefant client dashboards, identifying issues with WhatsApp bulk messaging and campaign dashboards not being integrated
  • Checked Della and Elefant client dashboards, identifying issues with WhatsApp bulk messaging and campaign dashboards not being integrated or accessible.
  • Apologized for a delay in communication.
  • Was queried to provide updates on Vishal's activities over the last two weeks, specifically regarding WhatsApp journey creation, and on Nazeer's performance and client handling.
  • Received critical feedback concerning client management and for not sharing meeting minutes from recent context calls.
  • Assigned a priority list of 16 UI/functionality fixes, with the workflow builder re-finalization pushed back to commence after these fixes are addressed.
• Created 3 SerpAPI accounts for Google article searches; however, the quota was exceeded today due to expanded usage, so is adding 2 more a
  • Created 3 SerpAPI accounts for Google article searches; however, the quota was exceeded today due to expanded usage, so is adding 2 more accounts and sent an email for the clinic.
  • Restarted the streamlit process for the Embryo Image Analysis project, which was down due to server issues, and added auto-restart on server reboots.
  • Integrated the fixed Embryo analysis tool into the fertility tools dropdown and explore tools landing page.
PavaN
• Completed the new user management service for 'god' users, enabling user addition/removal across multiple organizations and role checks. •
  • Completed the new user management service for 'god' users, enabling user addition/removal across multiple organizations and role checks.
  • Implemented and locally verified a mail service for multiple organization invitations, covering re-sending email verifications and displaying invitation statuses.
  • Added Merge Request links with detailed steps for the new user management and mail services to the task sheet.
  • Awaits clarification on whether the email preference task or the new mail service will be merged first into staging to apply a necessary tweak.
• Started working on the "Timeline Intelligence task" after seeking initial context. • Continued progress on the "Timeline Intelligence task
  • Started working on the "Timeline Intelligence task" after seeking initial context.
  • Continued progress on the "Timeline Intelligence task" throughout the day.
  • Inquired about tasks 306 and 299 to understand their context and priority.
  • Sought guidance on whether to add a customizable field for a specific requirement.
• Planned: Timeline intelligence • Planned: Chatbot homepage CTA correction
  • Planned: Timeline intelligence
  • Planned: Chatbot homepage CTA correction
• Planned: wrap up timeline intelligence task. • Planned: connect with Siddhant to discuss about further scope of this task. • Blocked: Was
  • Planned: wrap up timeline intelligence task.
  • Planned: connect with Siddhant to discuss about further scope of this task.
  • Blocked: Was unavailable until 5 PM today due to personal commitments.
Poonam Baranwal
Ramanand Tomar
• No activity captured for this day.
  • No activity captured for this day.
• No activity captured for this day.
  • No activity captured for this day.
• No activity captured for this day.
  • No activity captured for this day.
• No activity captured for this day.
  • No activity captured for this day.
Ritika Sankhla
• Posted an update or message related to the Tikitoro Proposal in the team group.
  • Posted an update or message related to the Tikitoro Proposal in the team group.
• Reached out to 15 new leads. • Conducted follow-ups. • Provided feedback on the new funnel, advising to categorize hospitals outside ICP a
  • Reached out to 15 new leads.
  • Conducted follow-ups.
  • Provided feedback on the new funnel, advising to categorize hospitals outside ICP as "Lost/Unsure Leads" instead of deleting them.
• Shared details for the MomsHome demo scheduled for today at 4:30 PM IST. • Provided updates on follow-ups, including Pink Polqa declining
  • Shared details for the MomsHome demo scheduled for today at 4:30 PM IST.
  • Provided updates on follow-ups, including Pink Polqa declining and Gladful deferring their decision to next week.
  • Had difficulty connecting with Prachi.
• Documented the Minutes of Meeting (MOM) for the BeyondChats x Mom’s Home demo call, noting their current use of QuickEngage, evaluation of
  • Documented the Minutes of Meeting (MOM) for the BeyondChats x Mom’s Home demo call, noting their current use of QuickEngage, evaluation of BiteSpeed AI, and key needs like scalability and response consistency.
  • Captured Mom's Home's support volumes as 100-150 daily queries and 4,000-5,000 monthly conversations during the demo call.
  • Shared comprehensive details for an upcoming demo with Quitci, including company and founder profiles, scheduled date/time, and the meet link.
Roshan Singh
Sachin K.
Santosh Asthana
Sarthak
Saurabh
• Began initial investigation into the video call chatbot project, inquiring about the existing framework (LiveAvatar or Livekit) and design
  • Began initial investigation into the video call chatbot project, inquiring about the existing framework (LiveAvatar or Livekit) and design.
• Discussed phased development for a video calling chatbot, outlining Phase 1 (seamless mobile/desktop use, Google Meet-like transcription a
  • Discussed phased development for a video calling chatbot, outlining Phase 1 (seamless mobile/desktop use, Google Meet-like transcription and UI), Phase 2 (multilingual support with Indian accents), and Phase 3 (integration with BeyondChats vector DB).
  • Explored modifying the prompt for care pathways generation on thebestmedicalcare.com for an Indian version.
Shahid Khan
Siddhant Jain
• Coordinated email sync for the dataset, confirming email automation is complete and ready for staging/testing. • Assisted in setting up SS
  • Coordinated email sync for the dataset, confirming email automation is complete and ready for staging/testing.
  • Assisted in setting up SSH access to the dev server for a team member.
  • Discussed the target branch for a video chatbot MR (lip sync fix), prioritizing testing on dev before moving to staging.
  • Blocked on testing due to non-working OpenAI API keys for dev and staging, and requested new ones.
  • Noted that the email sync task is blocked until Dr. Malpani provides Gmail access.
• The new chatbot embed UI was successfully made live. • Chatbots for Eric Ries and Product School were set up; the Eric Ries chatbot is liv
  • The new chatbot embed UI was successfully made live.
  • Chatbots for Eric Ries and Product School were set up; the Eric Ries chatbot is live and had its prompt tweaked, while the Product School chatbot is deployed but experiencing CSS issues.
  • Connected with Nazeer for new client onboarding on staging, sharing access details and documenting issues identified in the onboarding flow (e.g., CSMs lacking org creation ability, generic 400 validation errors).
  • Encountered a blocker where long file names break the 'Add Data' dialog on the mind-map page.
• Connected with Niraj, discussing Clinic OS for the next sprint, roadmap alignment, task setting pain points, and a plan for a follow-up me
  • Connected with Niraj, discussing Clinic OS for the next sprint, roadmap alignment, task setting pain points, and a plan for a follow-up meeting.
  • Progressed on the new support section, sharing a staging link for feedback, which aligns with the planned "code review + make live" task.
  • Provided detailed feedback and UI/UX suggestions for booking settings and the working hours section, including suggestions for adding time slots.
  • Discussed the video chatbot revamp, specifically requesting a fix to test lip sync improvements.
  • Identified a potential issue with proxy fallback breaking CSS and added it as a debugging task for later this sprint.
• Coordinated video call tasks with Saurabh and Yash, which included starting Dr. Malpani's avatar creation and planning infra changes. • Co
  • Coordinated video call tasks with Saurabh and Yash, which included starting Dr. Malpani's avatar creation and planning infra changes.
  • Conducted Knowledge Transfer (KT) for the new support section page with Devanshu and Nazeer, sharing planned improvements and discussing ticket functionality details.
  • Filled daily updates, coordinated the product connect meeting, and merged a fix to production (likely for suggested questions).
  • Added guidelines for editing erroneous data to the product sheet and disabled AI responses across all platforms for the churned client ivfmatters.
  • Currently fixing an issue with suggested questions not showing up on the dashboard and investigating a "low intent" leads issue.
Simran Jain
• Initiated the rescheduling of a call planned for May 20th. • Noted the reason for rescheduling as an event occurring from 7:30 AM on May 2
  • Initiated the rescheduling of a call planned for May 20th.
  • Noted the reason for rescheduling as an event occurring from 7:30 AM on May 20th.
  • Requested coordination with Ritika to identify suitable alternative slots for the call.
• Inquired about the status of the Prideivf project/call and confirmed that a call was rescheduled. • Followed up with other team members (S
  • Inquired about the status of the Prideivf project/call and confirmed that a call was rescheduled.
  • Followed up with other team members (Siddhant, Nazeer, Prachi) regarding their task completion and weekly updates.
  • Reminded the team to provide daily updates in the group.
• No activity captured for this day.
  • No activity captured for this day.
• Shared the Tikitoro proposal and received feedback for updates. • Drafted and shared detailed Terms & Conditions for a quotation submissio
  • Shared the Tikitoro proposal and received feedback for updates.
  • Drafted and shared detailed Terms & Conditions for a quotation submission to Grant Government Medical College.
  • Shared a document (link provided) with instructions to add it to the drive and share.
  • Communicated with Devanshu regarding a task.
Vishal 23cs460
• Blocked: Awaiting further tasks.
  • Blocked: Awaiting further tasks.
• No activity captured for this day.
  • No activity captured for this day.
• Deployed tasks 1-13 and the journey workflow builder to the test server. • Tested and verified tasks 1-13 on the test server. • Shared a d
  • Deployed tasks 1-13 and the journey workflow builder to the test server.
  • Tested and verified tasks 1-13 on the test server.
  • Shared a drive link (https://drive.google.com/file/d/1yjGBJh4Z3rikgGLdmiqxg3M7HwyU_Vvz/view?usp=drive_link).
  • The journey workflow builder is deployed to test but is pending testing.
• Added Merge Requests (MRs) for WhatsApp messaging backend and frontend, pointing to staging branches. • The MRs (https://gitlab.com/Pankaj
  • Added Merge Requests (MRs) for WhatsApp messaging backend and frontend, pointing to staging branches.
  • The MRs (https://gitlab.com/Pankaj-Baranwal/whatsapp-messaging-dashboard/-/merge_requests/49 and https://gitlab.com/Pankaj-Baranwal/beyondchats-node-backend/-/merge_requests/41) have been approved by Pankaj sir.
  • The approved MRs are ready to be merged to production.
Yash
• Integrated v2 of prompt management functionality. • Completed the changes for v2 prompt management and is awaiting instructions to test on
  • Integrated v2 of prompt management functionality.
  • Completed the changes for v2 prompt management and is awaiting instructions to test on the test server.
  • Provided an update that the Lip sync feature is currently in development.
  • Queried about the process for creating MRs to staging.
• Progressed on the Weekly ROI feature, requesting PM's email to test the mail UI from the test server. • Deployed Monthly report generation
  • Progressed on the Weekly ROI feature, requesting PM's email to test the mail UI from the test server.
  • Deployed Monthly report generation v2 with custom date range integration to the test server and requested PM review for creating the Merge Request.
  • Shared Merge Request links for chatgpt3_backend (MR 929) and beyond-chats-dashboard (MR 286).
  • Blocked by the availability of an OpenAI key.
• Submitted a staging fix for the voice and video call feature's OpenAI migration (MRs 27 and 209). • Worked on the video chatbot architectu
  • Submitted a staging fix for the voice and video call feature's OpenAI migration (MRs 27 and 209).
  • Worked on the video chatbot architecture revamp.
  • Encountered a beta endpoint deprecated issue while working on a fix.
  • Provided a detailed technical explanation for integrating LiveAvatar SDK with OpenAI Realtime API.
• Planned: Begin work on the videochatbot architecture revamp. • Requested a merge to staging/prod to restore voice/video call functionality
  • Planned: Begin work on the videochatbot architecture revamp.
  • Requested a merge to staging/prod to restore voice/video call functionality.
  • This merge is a prerequisite for forking a new feature branch to implement the planned architecture changes.
khushirass1998
🕉 नमः शिवाय